How To Install Aluminum Roof Panels?

Aug 28, 2024 Leave a message

 

Precautions for installing aluminum roof panels

 

Aluminum roofing is considered an ideal material for modern buildings because of its durability, weather resistance, green environmental protection and recyclability. However, in order to present a perfect aluminum roof and ensure excellent use effects, in addition to choosing high-quality aluminum panels, meticulous installation is also very important. The specific installation precautions are as follows:

ROOFING INSTALL2
ROOFINGINSTALL
ROOFING INSTALL3
ROOFING INSTALL

1. Before installation, be sure to clean the pollutants on the aluminum roof panels to avoid panel corrosion.
2. During installation, pay attention to the flatness of the panels and ensure that there is no bending or deformation.
3. The aluminum roofs overlap each other with a crest, so that they will be more solid and will not leak.
4. When installing roof panels, it is best to use anchors to help keep them flat, and there should be no gaps between the panels.
5. When installing the first plate, it needs to be installed according to the control line to maintain the parallelism of the plate and prevent the plate from scalloping.
6. Whether the installation of the slats meets the requirements is the basis for ensuring the flatness of the panels,the aluminum roof should be installed according to the spacing of the purlin. In order to avoid different spacing of the bolts, it is necessary to mark the aluminum panels and fix them on the purlin.
7. The installation order of the aluminum roof panels needs to be from high to low and from the middle part to the edge part. The connection method needs to be from low to high. After the starting line of the floor is installed, need to choose self-tapping nails to fasten both ends before installing the second board and mark it to facilitate checking whether there is any deviation in the board.
8. Each step of the installation of the aluminum roof panel needs to meet the design requirements. If it cannot be met, it needs to be adjusted in time and fully tightened.
9. After the installation is completed, it is necessary to check whether there are any omissions in the installation process or whether the aluminum roof panel is installed laogu. If it is not tightened enough, it will leak.

 

Aluminum Roofing Panels Installation 

 

The construction process of aluminum roof panels includes: construction preparation--measurement and layout--purlin installation--corrugated color aluminum panel installation--insulation layer installation--aluminum alloy support installation--aluminum alloy(3003/3004) roof panel installation--roof edge finishing and flashing treatment--roof cleaning--completion.


In the construction process, if customers have higher requirements for building windproof and noise reduction, they can also add waterproof and breathable layers, sound-absorbing cotton, and ventilation and noise reduction nets to further improve the waterproofing, ventilation, and noise reduction effects.Different roof structures also have different installation methods

 

Aluminum roof panel installation template

 

 

 

Material preparation
 

Aluminum Roofing Panels(3003/3004)

 

According to the design drawings and project requirements, choose the appropriate aluminum plate to use (aluminum plates usually use two types: high standing seam 65-430 and short  standing seam 25-430, and the thickness can usually be 0.7mm, 0.8mm, 0.9mm, 1.0mm and 1.2mm. The color and surface treatment of the aluminum roof panel can be customized according to the building requirements.

Purlin system

 

Purlin is a building material used to support the shape and fix the structure. For different roof structures (such as flat roofs, sloped roofs, curved structures, etc.), select appropriate keel materials (such as galvanized steel, aluminum alloy) and specifications. The keel system must have sufficient strength and stability to support the aluminum roof panels and resist external loads.

Fixing parts and auxiliary materials

 

Fixings: Fixings are mainly used to fix the purlin, such as self-tapping screws, gaskets, etc. It need to have sufficient strength and corrosion resistance to ensure long-term stability.
Auxiliary materials: Prepare waterproof membranes, breathable pipes, drainage grooves, sound-absorbing cotton, thermal insulation cotton and other auxiliary materials according to project requirements to improve the overall performance and aesthetics of the roof.

65-430
65-430 Aluminum panel
25-430
25-430 Aluminum panel
Install accessories
Install accessories
 
Construction preparation
 

Construction preparation includes review of drawings and preparation of specific construction plans. Construction preparation is the prerequisite for determining construction efficiency.

01/

On-site survey: Construction technicians need to understand the roof structure, drainage system and surrounding environment in advance in order to formulate the most appropriate construction plan

02/

Drawing review: Design, construction, supervision and other units need to review the drawings to clarify the design intent, construction requirements and precautions.

03/

Safety measures: Provide technical disclosure to construction personnel to ensure that they master the correct construction methods and safe operating procedures. Develop a detailed safety construction plan in advance to ensure safety during the construction process.

04/

Measurement and layout: Use the total station level to review the structural dimensions in order to confirm the welding height of the keel; lay out the keel installation position based on the reviewed dimensions.

Installation Process
 

Installation of purlins

During the installation of aluminum roof panels, the installation of keels not only affects the stability and safety of the roof panels, but also directly affects the service life and performance of the entire roof.
Before installing the purlin, it is necessary to lay out the line and position it to ensure that the position of each keel meets the design requirements and avoid installation errors caused by inaccurate positioning.
Hoist the cut keel to the work surface and accurately locate the installation position of the keel. The installation of the keel must be strictly placed according to the position of the design drawing to ensure that the center line of the component is on the same horizontal plane and horizontal up and down.
After the purlin is installed in place, it is welded and fixed. When welding, it is necessary to ensure that the weld is well formed, and the weld length and weld leg height meet the design requirements and construction specifications.
When installing the purlin, it is necessary to ensure flatness and verticality to avoid deformation or leakage of the roof panel due to uneven installation.

 

purlin instailtion

Installation Of Bottom Sheet

The bottom sheet is installed in the longitudinal direction. Before installation, the material needs to be laid out according to the diagram and the sheet area is marked. The bottom sheet is installed from bottom to top along the vertical direction of the purlin and is fixedly connected to the steel frame purlin using self-tapping nails with rubber rings.

 

2

   Installation of insulation layer

    When installing the insulation, lay it vertically with the aluminum foil facing downwards

 

insulation

Waterproof breathable membrane laying

The waterproof breathable membrane is laid on the roof according to the requirements of the drawings. During the specific laying process, the slope surface needs to be perpendicular to the slope direction.

 

4

T-type aluminum alloy Support installation

The T-Type aluminum alloy support is a load-bearing component that transfers the roof load to the purlin to prevent it from loosening or falling off due to natural factors such as wind, rain and snow. The quality of the aluminum alloy support directly affects the wind resistance of the roof panel.

 

T-Type support

 

3003/3004 Aluminum roofing Panels Installation

Before installing the aluminum roof panel, check the installation quality of the support again to ensure that it meets the installation requirements of the aluminum roof panel before installing the panel.
3003/3004 aluminum roof panels are installed on fixed brackets. The installation lock of the aluminum roof panel can well prevent rainwater leakage. The lock is tight and does not require nails or glue, and the appearance is beautiful.
The vertical lock edge aluminum roof panel adopts a 360-degree lock edge method, and the roof is completely impermeable and waterproof.

Aluminum roofing panel installation

 

Tear off the film

In the construction process, the construction specifications and safety operating procedures must be strictly followed to ensure construction safety and quality.
During the construction process, the protective film should be kept intact as much as possible to avoid scratches, so that it is easier to remove the film after completion. The film should be removed in time after the aluminum roof construction is completed. The transparent film needs to be removed within 10 days, and the non-transparent film within 15 days. If it is not removed in time, the surface film is prone to weathering, causing the roof to be unsightly.

 

Tear Off The Film

 

 

Professional aluminum roof panel supplier

 

Only produce high quality aluminum coils

Hanchen Metal are committed to providing customers with high-standard products and satisfactory services and highly efficient solutions.We have rich export experience and strong supply capacity, with an annual output of 300,000 tons. We exported to Middle East, Central Asia, Southeast Asia, Africa, South America and other regions.We sincerely hope to establish communication and connections with more and more industry professionals to make progress together for mutual benefit and win-win results.

High Quality

Custom Service

Free Sample

Trustworthy Service

Capacity

High Quality

Hanchen Metal conducts strict quality control from the selection of raw materials and paint to the entire processing process. If the customer needs it, we support product quality testing by a third party before shipment to ensure that the color-coated aluminum coils leaving the factory are high-quality products.

sample

Free Sample

If the customer needs it, we can provide the customer with pure color aluminum coil samples on the RAL color card or we can make it according to the sample sent by the customer or look for color-coated aluminum coils with similar patterns and designs and send them to the customer for confirmation.

PVDF Coating

Custom Service

We can adjust the color of the color coated aluminum coil according to the RAL color card, or customize the color, pattern or other design according to customer requirements.

Thickness

Trustworthy Service

Our professional sales will respond to customer inquiries and questions promptly and efficiently, providing customers with professional and detailed product introductions and efficient problem solutions.

 

 

 
Our factory & quipment
 

We have professional two automatic production lines with four-roller coating equipment.

3
looper
wash

 

apperance
painted room
5

 

 

 
Our Quality inspection
 

After the color aluminum coil is processed, we will test the color aluminum coil samples, including the size, thickness, color, glossiness, coating adhesion

MEK
reverse impact
Scratch test
 
 
Our Packing
 

Our packaging is carton + wooden pallet, but  we can also customize the packaging for you according to your needs

wood pallet package
package2
package

 

 

Our Certificate

QMS-Production
OHSM
EMS
QMS-Sales

 

 
Your Professional Coated Aluminum Coil Supplier

If you are interested in our product,please contact us

write to us
 sales@hanchenmetal.com
visiting us
Shandong, China
Fax
+8613969310856
Contact directly
+8613969310856

 

 

Send Inquiry